Rural Water and Sanitation Support Programme – Phase IV Component 3 “Improve financial sustainability of the Regional Water Companies”
The project has provided technical assistance to all water and sewerage companies in Kosovo to improve operational, financial and service performance as a contribution to improving financial sustainability. The areas targeted by the project include: billing system, water losses, water balance, service fees, Management Information System, asset management, and customer service. The project has helped […]
Support to waste management in Kosovo, with the Identification Number EuropeAid/133800/D/SER/XK – Task 3: Tender Documents for the Priority Projects to be financed by IPA
Kiwer was part of the team led by EPEM SA responsible for conducting the feasibility study, primary design, and Environmental and Social Impact Assessment (ESIA) for the following Solid Waste Management (SWM) infrastructure projects: the construction of the Sanitary Landfill in Zveçan; the upgrade of the Existing Transfer Station and construction of a Material Recycling […]
Consulting Service for Institutional and Operation Support for the WWTP of the Regional Water Company in Prizren – (Accompanying Measures)
The project focused on enhancing the institutional and technical capacities of the Water and Wastewater Company Hidroregjioni Jugor of Prizren to effectively manage operations at the new Wastewater Treatment Plant (WWTP). The project was divided into two phases: the first phase concentrated on institutional strengthening, while the second phase focused on professional training. Key areas […]
Khujand Wastewater Project – Phase III – Corporate Development, Stakeholder Participation and City Support Programmes
Phase III of CDP will focus on the rehabilitation of the wastewater management system in the City Khujand (Tajikistan) with an aim to reach compliance with relevant EU directives. In parallel to the physical development investment, the technical assistance project aims to further improve the financial and operational performance of KWC and strengthen the Public […]
Aktobe Water Project – Corporate Development Programme
The EBRD in collaboration with the Aktobe Water Company and the City of Aktobe developed the Aktobe Water Project to upgrade the water and wastewater services in the City of Aktobe. As part of this project, a Corporate Development Programme was requested to improve the performance of the Company with respect to EBRD’s loan covenants […]
Kyzylorda Water – Corporate Development Programme
The EBRD had developed this project together with the Kyzylorda Water Company and the City of Kyzylorda to upgrade the water and wastewater system in the City. The Project helped the Company to improve its water and wastewater services by financing priority investments for the water supply and wastewater management infrastructure as well as a […]
Feasibility study, ESIA and main design for the Composting Plant in Gjilan
KIWER was tasked to carry out Feasibility study, ESIA and main design for Cthe Composting Plant in Gjilan which is listed as the priority project in the Integrated Waste Management Strategy 2021 – 2030 and Waste Management Action Plan 2021 – 2023. The Activities carried out by the project included: Market Analysis; Feedstock scenarios and […]
Support the Ministry of environment, spatial planning and infrastructure on revising the Kosovo integrated waste management strategy (2021-2030) and the Action plan (2021-2023)
KIWER was part of the team led by RWA tasked with the mid-term revision of the waste management strategy. Project Activities included: Development of recycling targets foreseen/integrated in the draft Strategy; Options Analysis and Recommendations on System Development of the strategy; Revising the Action Plan (2021-2023), and Revising the Action Plan (2021-2023)
The final evaluation of the PROJECT KSV/018INSTITUTIONAL AND TECHNICAL SUPPORT FOR THE WATER SUPPLY SYSTEM, MITROVICA REGION (PHASE II)
The water program financed by Lux Dev in the city of Mitrovica and neighboring municipalities Vushtrri, Skenderaj, and Mitrovica North has been evaluated by the project. A risk assessment was conducted by the consultant to identify potential risks and challenges associated with the water program. Relevant data and documentation related to the water program were […]