Support to waste management in Kosovo, with the Identification Number EuropeAid/133800/D/SER/XK – Task 3: Tender Documents for the Priority Projects to be financed by IPA
Kiwer was part of the team led by EPEM SA responsible for conducting the feasibility study, primary design, and Environmental and Social Impact Assessment (ESIA) for the following Solid Waste Management (SWM) infrastructure projects: the construction of the Sanitary Landfill in Zveçan; the upgrade of the Existing Transfer Station and construction of a Material Recycling […]
Feasibility study, ESIA and main design for the Composting Plant in Gjilan
KIWER was tasked to carry out Feasibility study, ESIA and main design for Cthe Composting Plant in Gjilan which is listed as the priority project in the Integrated Waste Management Strategy 2021 – 2030 and Waste Management Action Plan 2021 – 2023. The Activities carried out by the project included: Market Analysis; Feedstock scenarios and […]
Support the Ministry of environment, spatial planning and infrastructure on revising the Kosovo integrated waste management strategy (2021-2030) and the Action plan (2021-2023)
KIWER was part of the team led by RWA tasked with the mid-term revision of the waste management strategy. Project Activities included: Development of recycling targets foreseen/integrated in the draft Strategy; Options Analysis and Recommendations on System Development of the strategy; Revising the Action Plan (2021-2023), and Revising the Action Plan (2021-2023)