Municipal Water Supply and Sewage Disposal in Prishtina Phase III, Component No.1 Construction of Water Transport Facilities, Plant. Construction of Water transport facilities. The project includes the supply, construction, installation, completion, operation and maintenance of the following Works:
– Raw water intake from Iber Canal at Mihaliq;
– Gravity pipeline DN1200 length 9.0 km from Mihaliq to the pumping station at Milosheva;
– Raw water pumping station at Millosheva;
– Pressure main DN1200 length 4.5 km from Millosheva to the water treatment plant Shkabaj;
– Transmission pipes DN800 length 3.8 km and DN800 length 2.8 km to connect the water treatment plant to the existing reservoirs Shkabaj and Arberia
and Component No.2 Construction of Water Treatment Plant